All systems
CP-120

HVAC & Cooling

Central Chiller Plant Restoration

Coordinated condenser and evaporator loop cleaning designed to recover chiller energy performance.

Materials compatibility

MS, SS, copper, brass alloys, PVC, EPDM, PP, CPVC and cast iron

The operating challenge

Recover cooling efficiency. Renew plant performance.

Scale and biological films insulate chiller tubes, forcing compressors to draw more power and reducing the plant's coefficient of performance.

Lowers compressor amperage
Restores approach temperature
Improves system COP
Stabilizes operating pressure
Clean industrial heat exchanger tubing

Coordinated chemistry

The two-stage restoration system

Stage I · Product DI

Descale & inhibit

PRODUCT DI uses bio-based chelators, botanical wetting agents and organic corrosion inhibitors to dissolve mineral scale, iron deposits and hardness residues without aggressive metal erosion.

Stage II · Product DF

Flush & neutralize

PRODUCT DF is a clarifying neutral flush that removes suspended residue, returns the circuit to a neutral pH and conditions metallic and polymer surfaces for restart.

Technical profile

Specification at a glance

ParameterProduct DI / ActiveProduct DF / Recovery
AppearanceClear to pale amber liquidWater-white to pale straw liquid
OdorMild herbal extractMild, clean and neutral
Operating pH2.8–4.56.5–7.5
Water solubility100% miscible100% soluble
Safety statusNon-hazardousGHS safe handling

Do not mix concentrated treatment products with chlorine, hypochlorites, oxidizers, bleach or harsh caustics. Standard PPE is required.

Clean-in-place protocol

A measured path to restart

  1. 01Isolate the target water loop and connect the CIP pump.
  2. 02Circulate DI for 3–6 hours at ambient to 45°C.
  3. 03Drain the scale-loaded fluid completely.
  4. 04Circulate DF for 30–60 minutes, flush, refill and reconnect.

Verification scorecard

Approach temperature at baseline
Compressor current reduced
COP improvement verified
Pressure variation below 5%

Application sectors

Commercial campusesIndustrial facilitiesHospitalsData centresProcess cooling

Technical inquiry · CP-120

Review your operating challenge with us.

Contact technical team